top of page

Product Development Life Cycle ARP4754 Related Articles

PASE Presentation
 

Process Aided Systems Engineering (PASE) provides a structured methodology to respond to the challenges of Product Development, ensuring inherent compliance with SAE ARP4754 / ARP4754A

 

The Product life cycle comprises a number of main phases, including:

- The pre-launch phase, made of the concept definition, the business case set-up and, once the program go-ahead has been given by upper management, the launch phase

-  The program / Product development planning, where the Development Plan, the Requirement Validation Plan, the Verification Plan, the Implementation Plan, the Safety Program Plan, the Process Assurance Plan and the Configuration Management Plan, along with the Project Plan and schedules are defined

-  The systems Request for proposal, proposal submittal and contract negotiations and award phases.

- The Product Development phase and the systems and sub-systems / component, software and hardware development phases

- Manufacturing, sales and delivery phases

- In-service support phase

- Once the Product has reach it end-of-first life, the Product second life phase

- Finally the Product decommissioning phase

Knowledge-Centric System

 

 

A knowledge-centric system is built as described in figure 

Introduction to ARP4754

 

 

Please see dedicated page:

 

© 2015 by PLG-PASE Solutions. Proudly created with Wix.com.

  • Wix Facebook page
  • Twitter Classic
  • Google Classic
bottom of page